Wiki Log
Append-only record of all ingests, queries, and lint passes.
Each entry header format: ## [YYYY-MM-DD] operation | title
Quick parse: grep "^## \[" log.md | tail -10
[2026-04-15] setup | Wiki initialised
- Directory structure created: raw/, wiki/strategies/, wiki/outcomes/, wiki/commitments/, wiki/tensions/, wiki/entities/, wiki/themes/, wiki/comparisons/
- CLAUDE.md schema written — covers ingest, query, and lint workflows; page type definitions; frontmatter conventions; department abbreviation table
- index.md and log.md initialised
- No sources ingested yet
[2026-04-15] lint-fix | Applied fixes from lint-report.md — first fix pass
All priority fixes from wiki/lint-report.md applied.
Critical fixes applied:
- Renamed
wiki/strategies/circular-economy-waste.md→wiki/strategies/circular-economy-waste-policy.md; updated all references in defra.md, target-delivery-plans.md, defra-residual-waste-287kg-2042.md, themes/circular-economy-waste.md, and index.md — naming collision with theme page resolved - Fixed broken
[[desnz-clean-power-2030]]→[[desnz-clean-power-95pct-2030]]in climate-biodiversity-actions-2025.md - Updated defence spending commitment from 2.5% to 2.6% (Spending Review figure); renamed commitment page to
mod-defence-spending-2-6pct-gdp-2027.md; updated all references in mod.md, budget-spending-review-2025.md, defence-oda-funding.md, index.md
Broken links resolved:
[[nhs-waiting-times]]in 10yr-infrastructure-strategy.md →[[dhsc-nhs-18-week-92pct]][[defence-industrial-strategy]]in industrial-strategy-2025.md and budget-spending-review-2025.md — removed (content covered within industrial-strategy-2025)[[net-zero-2050]]in clean-power-2030.md →[[uk-net-zero-2050]]- Duplicate
[[circular-economy-waste]]in defra-residual-waste-287kg-2042.md → one replaced with[[circular-economy-waste-policy]]
New pages created (38 total):
- Entities: dhsc.md, skills-england.md, great-british-energy.md, neso.md, elm.md, nature-restoration-fund.md, national-wealth-fund.md, biodiversity-net-gain.md
- Outcomes: residual-waste-reduction.md
- Commitments — Defra biodiversity (10): defra-30by30, defra-habitat-250kha-2030, defra-sssi-50pct-2030, defra-woodland-43kha-2030, defra-woodland-16-5pct-2050, defra-agri-water-quality-12pct-2030, defra-lnrs-48-2025, defra-farm-wildlife-double-2030, defra-marine-49pct-2030, defra-air-quality-30pct-2030, defra-hedgerows-48km-2037
- Commitments — EA flood (5): ea-flood-protection-52k-properties, ea-10-5bn-flood-investment-2021-27, ea-flood-asset-98pct-condition, ea-flood-new-framework-april-2026, ea-nafra-100pct-coverage-summer-2026
- Commitments — HMT (8): hmt-725bn-infra-decade, hmt-rd-22-6bn-2029, hmt-affordable-homes-39bn, hmt-sizewell-c-14-2bn, hmt-780-pipeline, hmt-infra-hospital-6bn, hmt-infra-schools-3bn, hmt-infra-prisons-600m
- Commitments — MHCLG (2): mhclg-150-infra-decisions, mhclg-nature-restoration-fund
- Commitments — DHSC/DWP (2): dhsc-nhs-29bn-increase, dwp-pathways-work
- Commitments — Climate (2): uk-net-zero-2050, uk-2035-ndc-81pct
- Commitments — DESNZ capacity (4): desnz-offshore-wind-43-50gw-2030, desnz-onshore-wind-27-29gw-2030, desnz-solar-45-47gw-2030, desnz-battery-23-27gw-2030
Stale milestone flags added:
- climate-biodiversity-actions-2025.md: Land Use Framework (late 2025 — status unknown), SSEP (2026 — unconfirmed)
- net-zero-clean-power.md theme: SSEP “2026 milestone” open question added
- Existing flags in water-flooding.md (Water White Paper Transition Plan) already present
Other fixes:
- NaFRA methodology note added to fcerm-strategy-reports.md (5.5m → 6.3m figure explained)
- circular-economy-waste theme related field updated (self-reference removed)
- index.md substantially expanded and reorganised by commitment owner
Remaining open items (not yet created):
wiki/commitments/defra-land-use-framework.md— stale claim; status unknown; create when publication confirmedwiki/outcomes/nhs-waiting-times.md— decided to resolve via link fix to existing dhsc-nhs-18-week-92pct instead
[2026-04-15] ingest | First-pass batch ingest — 52 source documents
All 52 source documents ingested in first-pass batch across 11 thematic domains.
Sources ingested (by domain):
- core-strategy (4): 10yr infra strategy, working paper, pipeline 2023, NISTA annual report 2024-25
- spending-fiscal (3): Budget 2025, Spring Statement 2025, Spending Review 2025
- industrial-strategy (6): Industrial Strategy 2025, sector plans overview, defence sector plan, Q3 and Q4 quarterly updates, economic indicators methodology
- clean-power-energy (6): Clean Power 2030 action plan, technical annex, connections annex, metrics, skills annex, EN-1 NPS 2025
- defra-environment (7): EIP 2025, EIP 2023, progress reports 2023-24 and 2024-25, OEP response 2025, Natural England action plan, climate-biodiversity actions
- flood-coastal (8): FCERM strategy 2020, roadmap 2026, annual reports 2022-25, NaFRA 2024, surface water flooding response, floods funding consultation
- water-sector (5): Water White Paper 2026, PR24 final determinations, water resources 2023-24 and 2024-25, accelerated infrastructure 2023
- planning-delivery (5): Planning and Infrastructure Act 2025, bill guide, overarching IA, reform working paper, Green Book 2025
- farming-rural (3): SFI changes Jan 2026, Farming Profitability Review, Animal Welfare Strategy
- circular-economy-waste (3): Resources & Waste Strategy 2018, Waste Prevention Programme 2023, Circular Economy Package statement
- target-delivery-plans (2): Agriculture Water Quality TDP, Residual Waste TDP
Wiki pages created:
- 12 strategy pages
- 7 outcome pages
- 8 commitment pages
- 10 entity pages
- 8 theme pages
- 8 tension pages
- index.md updated
Key tensions identified:
- defence-oda-funding — ODA cut funds defence uplift (high severity)
- clean-power-marine-environment — Offshore wind vs. MPA condition (high severity)
- housing-biodiversity — 1.5m homes vs. 250,000ha habitat (high severity)
- sfi-simplification-water-quality — Internal Defra conflict between SFI simplification and statutory water quality targets (high severity)
- delivery-confidence-fiscal-ambition — Rising red-rated GMPP projects vs. £725bn infrastructure ambition (high severity)
- water-regulator-reform-pr24-uncertainty — Ofwat proposed for abolition during active £104bn PR24 cycle (medium-high)
- skills-shortage-cross-sector — Competing workforce demands across clean power, defence, housing, IS-8 (high severity)
- planning-timelines-2030-targets — PIA Royal Assent Dec 2025 vs. hard 2030 infrastructure deadlines (high severity)
Key delivery status findings:
- 6 of 7 outcomes assessed as at-risk based on available evidence
- 31 GMPP projects (15%, £198bn whole life cost) red-rated — count rising
- SFI January 2026 simplification introduces direct risk to multiple statutory environmental targets
- Water regulator reform creates £104bn investment uncertainty during active PR24 cycle
- Multiple 2030 targets face tight/impossible planning timelines given infrastructure lead times